Provided from airport to church as well as to Costco once you are here.
Exterior: Tear off and replace exterior surface (currently red aluminum siding), removal of tress on undeveloped property. Property line follow residential fences to the south and the auto shop wall to the west across the parking lot. Sanctuary entrance concrete porch removal and replacement. Sanctuary pillars repainted. Updated light fixtures throughout exterior and additional high wattage steeple lights. Removal and repour of damaged driveway and parking lot areas.
Sanctuary: Stage remodel: Removal of choir loft levels (level stage to the current main level all the way to the back wall), close the baptismal opening, relocate the baptismal into the stage, remodel stage to make that possible, resurface stage with low-pile carpet and hardwood, make ceiling black (paint or change surface material), replace hanging chandeliers with modern fixtures, resurface floor (low pile carpet), remove pews (contingent on chair purchase), repaint sanctuary (remove pale pink). In balcony remove recording booth, move pews from floor to fill space where booth is and paint.
Legacy Room (Prayer Chapel on map): Paint and remove wall between prayer chapel and baptismal heater room.
Fellowship Hall: Expand fellowship hall to eastern exterior wall, remove classroom walls (102A-D on floor plan), remove carpet, install vinyl plank, replace light fixtures, and paint.
Offices: Removal of various built in cabinets/shelves, removal of flooring, installation of vinyl plank, paint and residential-style construction (bookshelves, counter tops, etc).
2nd Floor: Paint in nursery/kids classes and removal of junk.
3rd Floor: Paint in youth area and removal of junk.
Please call for more information.